Weiss-Greene

Location
Fishers Landing, NY

Design
Stephanie Weiss | Jeremy Greene

Description
An extensive overhaul of a farmhouse built circa 1846. Relocation of an existing wing of the house and reconstruction of the foundation underneath it, extensive rebuilding and refinishing of the interior, installation of a radiant-heat floor system, installation of spray-foam insulation, custom built-in furniture.

http://www.greenestructures.com/files/gimgs/27_wgfh2003beforesouthbw432x288.jpg
South Elevation
Before
http://www.greenestructures.com/files/gimgs/27_wgfh2003duringframingc432x288.jpg
South Elevation
During
http://www.greenestructures.com/files/gimgs/27_wgfh2003duringsouth432x288.jpg
South Elevation
During
http://www.greenestructures.com/files/gimgs/27_wgfh2004aerialview432x287.jpg
Aerial View
During
http://www.greenestructures.com/files/gimgs/27_wgfh2003beforeeastporch190x287.jpg
East Porch
Before
http://www.greenestructures.com/files/gimgs/27_wgfh2003beforewest432x288.jpg
West Elevation
Before
http://www.greenestructures.com/files/gimgs/27_wgfh2003beforeinterior432x287.jpg
Interior
Before
http://www.greenestructures.com/files/gimgs/27_wgfh2003beforekitchen432x287.jpg
Kitchen
Before
http://www.greenestructures.com/files/gimgs/27_wgfh2003duringkitchen190x287.jpg
Kitchen
During
http://www.greenestructures.com/files/gimgs/27_wgfh2004afterkitchen432x237.jpg
Kitchen
After
http://www.greenestructures.com/files/gimgs/27_wgfh2003duringfoundationa432x287.jpg
Kitchen Foundation
During
http://www.greenestructures.com/files/gimgs/27_wgfh2003duringfoundationc190x287.jpg
Kitchen Foundation
During
http://www.greenestructures.com/files/gimgs/27_wgfh2003duringfoundationb190x287.jpg
Kitchen Foundation
During
http://www.greenestructures.com/files/gimgs/27_wgfh2003duringkitchenmoving432x288.jpg
Kitchen Moving
During
http://www.greenestructures.com/files/gimgs/27_wgfh2003duringframingd190x287.jpg
Kitchen Moving
During
http://www.greenestructures.com/files/gimgs/27_wgfh2003duringfoundationrebuilding190x287.jpg
Foundation Rebuilding
During
http://www.greenestructures.com/files/gimgs/27_wgfh2003duringframinga432x288.jpg
Reframing with 2x6's
During
http://www.greenestructures.com/files/gimgs/27_wgfh2003duringframingb432x288.jpg
Reframing with 2x6's
During
http://www.greenestructures.com/files/gimgs/27_wgfh2003duringframinge432x288.jpg
Reframing and Radiant-heat Floor
During
http://www.greenestructures.com/files/gimgs/27_wgfh2004duringradiantfloor190x287.jpg
Radiant-heat Floor
During
http://www.greenestructures.com/files/gimgs/27_wgfh2004duringinsulationa190x287.jpg
Spray-foam Insulation
During
http://www.greenestructures.com/files/gimgs/27_wgfh2004duringinsulationb432x287.jpg
Spray-foam Insulation
During
http://www.greenestructures.com/files/gimgs/27_wgfh2004duringsidingsouth190x287.jpg
Siding South
During
http://www.greenestructures.com/files/gimgs/27_wgfh2004duringsidingnorth432x288.jpg
Siding North
During